PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Building rebar columns for Elev. 1,2,3  (3rd Floor) Facing East (800x600).jpg Erecting the steel arch at Derrick -2 (2nd Floor) Facing North (800x600).jpg Erecting the steel arch at Derrick -2 (2nd Floor) Facing North-West (800x600).jpg Excavating for underground storm piping between column lines G-G.1 Facing South-East (800x600).jpg Finishing wiring the electrical panel Facing South (800x600).jpg Installed pour stops at Derrick -3 (2nd Floor) Facing East (800x600).jpg Pour stops at Elev. 5,6 (2nd Floor) Facing West (800x600).jpg Started installing shear wall panels at Elev. 4-Stair -2 (3rd Floor) Facing South-West (800x600).jpg Started underground storm piping between column lines G-G.1 Facing North (800x600).jpg
Previous pageNext page Finishing wiring the electrical panel Facing South (800x600)
Finishing wiring the electrical panel Facing South (800x600)